Alpha & Omega Group designed and prepared construction drawings to replace two pedestrian bridges and one boardwalk that were constructed over the sanitary sewer lines at Bond Lake, which were damaged during flooding in 2016.

The first structure to be replaced is a 43-foot, three-span bridge that was built on top of a 24-inch sewer line. The bridge will be replaced with a culvert. The second bridge was also built on top of a sewer line and will be replaced with a culvert. A third structure, a 225-foot boardwalk on the Green Hope greenway, will be replaced with a new boardwalk. A&O is providing the data collection, hydrologic and hydraulic analysis, structural design, and construction documents on these projects.