Assessment
and Design

Site Development

Bridge Preservation


Assessment  and Design

How is the impact to airport operations minimized when the main connector between commercial and general aviation needs to be overhauled?

 

 

 

 

Home > Portfolio – Government – Municipal > RDU Tunnel Road

RDU Tunnel Road
Client Location Services Provided Contact Person Project Cost Start/Bid Date Completion Date Project Manager


In the summer of 2001, Alpha & Omega Group was selected by Raleigh Durham Airport Authority to provide pavement design, contract documents, construction administration and 24-hour construction observation for the re-construction of International Drive, locally known as Tunnel Road.

A fast-tract project schedule minimized the impact to RDU operations and general public flight plans, through only eight days of roadway closure. The $340K project involved removing existing pavement, removing & replacing unsuitable soils, repairing the existing storm drainage system, and installing a sub-drainage system to carry perched water away from the roadbed. NCDOT Superpave mixes were used for base and surface material due to heavy bus traffic and high tire pressures.

© 2011-2014 Alpha & Omega Group. All Rights Reserved. Firm License No. C-1684
Hospital Fire Station RDU Parking Deck Biltmore Bridge Float Bridge Parking Deck Hospital Fire Station RDU Parking Deck Float Bridge