Emergency Bridge Replacements
Bond Lake, Cary
The two bridges were replaced with culverts. A third structure, a 225-foot boardwalk on the Green Hope greenway, was replaced with a new boardwalk. A&O provided the data collection, hydrologic and hydraulic analysis, structural design, and construction documents on these projects. Ω
Overview
- Client:
Town of Cary - Location:
Cary, NC - Contact:
Paul Kuhn, PLA
Town of Cary Transportation and Facilities Department
919-469-4360 - Design fee:
$61,925 - Construction cost:
$345,000 - Start/complection:
8/2016 –
5/2017 (design)
8/2018 (construction) - Project manager:
Glenn Zeblo, PE - Construction manager:
Forrest Robbins
Experience
- Boardwalk design
- Culvert design
- Bridge replacement
- Boardwalk replacement
- Data collection
- H&H Analysis
- Construction documents