Raleigh Chinese Christian Church
Roadway Design
Based on future thoroughfare plans, Chapel Hill Road will ultimately become a four-lane divided facility. A&O provided designs to accommodate 870 feet of this future typical section along the property’s road frontage, extending and connecting to a recently widened section of the road just east of the property. The improvements included resurfacing the existing pavement and adding up to 36 feet of new pavement to provide a total width of 48.5-feet as measured from the centerline of the road. The design also included curb and gutter, a 10-foot multipurpose path and storm drainage.
As a part of this project, the Town of Cary required a 500-foot extension of Allen Lewis Drive connecting to an existing roundabout at the north end, and Chapel Hill Road on the south end. A&O provided horizontal and vertical designs, storm drainage design, erosion control plans, pavement marking, and signage.
A&O worked with The Town of Cary, North Carolina Department of Transportation and the North Carolina Department of Environmental Quality Division of Water Resources to obtain required approvals and permits. Ω
Overview
- Client:
Raleigh Chinese Christian Church - Location:
Cary, NC - Subconsultants:
Tate Landscape – Landscape architecture - Contact:
Tainang Huang
Raleigh Chinese Christian Church
919-834-3815 - Profession fees:
$56,525 - Start/completion:
5/2004 – 8/2018 - Project manager:
Glenn Zeblo, PE
Experience
- Roadway design
- Stormwater engineering
- Erosion control
- Pavement markings
- Signage

