Rumbling Bald Resort Bridge Replacements
A&O managed the full scope of services that included surveying, geotechnical, structures, hydraulics, environmental permitting, erosion control, utility coordination, cost estimates, specifications, and construction administration including material testing.
Because of the storm, an emergency replacement resulting in bridge plans being developed in approximately 60 days was required. Within 30 days, we developed the 45-ft cored slab bridge configuration, with quantities, so that the contractor could include both bridge replacements in their contract.
The Quail Ridge Bridge replacement consists of a single-span, cored slab bridge spanning 55 feet across Trout Stream. A 27-foot wide bridge has a sidewalk on one side and a modified one-bar metal rail. As part of the utility coordination, Duke Energy relocated power off of the bridge. Ω
Overview
- Client:
Rumbling Bald Resort - Location:
Lake Lure, NC - Subconsultants:
F&R – Materials testing, geotechnical surveys, field coordination - Contact:
James Cain, CMCA, AMS
828-877-4471 - Costs:
$66,857 - Start / completion:
6/2017 – 7/2019 - Project manager:
Ted Bartelt, PE - Construction manager:
Forrest Robbins
Experience
- Bridge inspection
- Bridge replacement design
- Coordination
- Hydraulic design
- Erosion control design
- Environmental permitting
- Utility coordination
- Cost estimates
- Specifications
- Construction administration