Franklin Correctional Center
Site Improvements
To prevent the flooding of the Medical Operation building, we designed a replacement for the concrete walkway, redirecting water to a concrete drainage swale that connected to a new trench drain, with an additional discharge pipe downstream. To resolve the non-compliant entrances, we added landings with properly-sized steps at the entry of the dormitory. We designed ADA-compliant ramps to accommodate everyday use as well as medical emergencies.
Our scope included a field investigation to take measurements; preparation of construction drawings with notes for construction; and preparation of an estimate of probable construction cost. Ω
Overview
- Client:
North Carolina Department of Public Safety - Location:
Franklin County, NC - Contact:
Matthew Wells
Project Manager, NCDPS
919-324-1299 - Project Cost:
$ 4,835. - Start / completion:
7/2017 – 7/2019 - Project manager:
Glenn Zeblo, PE
Experience
- Structural assessment
- Stormwater repair
- ADA design
- Construction drawings
- Estimate of probable cost