Group Q Division 13
Bridge Replacement
The hydraulic scope of work included the development of three culvert survey reports and one pipe data sheet. One location was within a FEMA-detailed study and required a memorandum of agreement.
The structural scope of work included the development of plans and specifications for a single 10’x5’ RCBC and concrete headwalls for two aluminized corrugated metal pipe culverts.
The erosion and sediment control scope of work included the development of plans and specifications to protect a stream from sediment generated from site construction. One location was classified as a trout stream, while another was classified as high quality waters. Ω
Overview
- Client:
NCDOT 13 - Location:
McDowell and Rutherford Counties - Prime consultant:
CH Engineering - Contact:
Tom Hepler, PE
CH Engineering
919-788-0224 - Design Cost:
$98,200 - Start/completion:
11/2011 – 6/2013 - Project manager:
Ted Bartelt, PE
Experience
- Culvert and Pipe survey report
- Bridge replacement design
- Culvert design
- Headwall design
- Erosion and sediment control
