Cliffs of the Neuse
Toilet Building Replacement
A new toilet building was constructed to replace the original toilet buildings within the park. The original sanitary system was partly demolished and abandoned. The new toilet building meets ADA accessibility requirements from the left and has standard access from the front and right side. A sanitary lift station was designed to jointly use the existing force main extending from the bath house to a nitrification field previously designed to accommodate the bath house and toilet building. Domestic water service was extended to the toilet building from the existing park water system. Ω
Overview
- Client:
North Carolina Parks & Recreation - Location:
Goldsboro, NC - Contact:
Erin Lawrence, PE
919-707-9322 - Project Cost:
$336,000 - Start/completion:
3/2002 – 12/2004 - Project manager:
Glenn Zeblo, PE
Experience
- Toliet building foundation
- ADA permitting
- Piping extension