Honeycutt Creek Greenway
Structural and hydraulic design
The design work for the nearly five miles of greenway involved hydraulic studies on East Fork Mine Creek and Honeycutt Creek. We prepared and submitted a conditional letter of map revision (CLOMR) and prepared design and construction drawings for three pre-engineered bridges, 16 bridges/boardwalks with a total length over 2,500 feet, and nine retaining walls.
A&O provided construction administration services, which included special inspections, submittal reviews, and payment application reviews. We served as the liaison between the contractor and owner and prepared change orders. Ω
Overview
- Client:
City of Raleigh Parks, Recreation and Cultural Resources - Location:
Raleigh, NC - Prime Consultant:
WSP Sells - Contact:
Lisa Schiffbauer
City of Raleigh Greenway Planner
919-996-4785 - Project cost: $267,532
- Start / completion:
5/2013 – 4/2016 - Project manager:
Ted L. Bartelt, PE - Construction manager:
Forrest E. Robbins
Experience
- Bridge design
- Boardwalk design
- Retaining wall design
- Hydraulic studies
- Flood studies
- Construction drawings
- Construction administration