Lake Crabtree Fishing Pier and Boat Ramp Renovations
In order to repair the damage, new aluminum gangways and replacement approaches for the gangway connections were installed on both structures. The decks and timber were resurfaced with composite decking, and galvanized pipe picket rails were installed. The replacement approach rails were made of timber and infilled with coated chain-link fence to improve stability.
A&O delivered design development, construction drawings, and specifications showing plans for the repairs. We also developed an engineer’s opinion of probable construction costs. During the construction phase, we provided bidding assistance and construction administration services for the completion of both structures. Ω
Overview
- Client:
Wake County - Location:
Raleigh, NC - Contact:
Eric Staehle
Wake County Facilities Design & Construction
(919) 856-6369 - Design fee:
$16,500 - Construction cost:
$116,215 - Start/completion:
6/2020 – 7/2021 - Project manager:
Ted L. Bartelt, PE - Construction manager:
Forrest Robbins
Experience
- Boardwalk design
- Pier design
- Repair design
- Construction drawings